Case Study: Custom Dobok Martial Arts Wear for a Wholesale Distributor in the United Arab Emirates
Dobok Martial Arts Wear for a Wholesale Distributor in the United Arab Emirates
A Wholesale Distributor approached us with a dobok martial arts wear requirement for the United Arab Emirates. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Unclear responsibility when a defect shows up after washing
- Long lead times that miss the selling season
- Inconsistent sizing between production runs

What we specified
| Product | Dobok Martial Arts Wear |
|---|---|
| Client type | A Wholesale Distributor |
| Market | the United Arab Emirates |
| Order volume | 800 pieces across 4 colourways |
| Base fabric | Stretch Denim |
| Decoration | Puff Printing |
| Size range | Custom grading |
| Sampling rounds | 2 |
| Delivery window | 10 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Stretch Denim and locked shrinkage allowance before grading.
- Decoration was moved to Puff Printing after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 800 pieces delivered inside the 10-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.



