Case Study: Custom Green Down Jacket Women for a Professional Sports Club in Taiwan
Green Down Jacket Women for a Professional Sports Club in Taiwan
A Professional Sports Club approached us with a green down jacket women requirement for Taiwan. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Long lead times that miss the selling season
- Unclear responsibility when a defect shows up after washing
- Color drift between lab dips and bulk fabric

What we specified
| Product | Green Down Jacket Women |
|---|---|
| Client type | A Professional Sports Club |
| Market | Taiwan |
| Order volume | 5,000 pieces across 6 colourways |
| Base fabric | Eyelet |
| Decoration | Beading and Embroidery |
| Size range | 2-12Y |
| Sampling rounds | 2 |
| Delivery window | 5 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Eyelet and locked shrinkage allowance before grading.
- Decoration was moved to Beading and Embroidery after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 5,000 pieces delivered inside the 5-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.