Case Study: Custom Grey Beanie for a Public School District in Argentina
Grey Beanie for a Public School District in Argentina
A Public School District approached us with a grey beanie requirement for Argentina. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Long lead times that miss the selling season
- Color drift between lab dips and bulk fabric
- Inconsistent sizing between production runs

What we specified
| Product | Grey Beanie |
|---|---|
| Client type | A Public School District |
| Market | Argentina |
| Order volume | 500 pieces across 2 colourways |
| Base fabric | Satin |
| Decoration | Enzyme Wash |
| Size range | S-4XL |
| Sampling rounds | 2 |
| Delivery window | 5 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Satin and locked shrinkage allowance before grading.
- Decoration was moved to Enzyme Wash after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 500 pieces delivered inside the 5-week window.
- Unit cost held within 2.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample from the actual bulk fabric. Proto cloth behaves differently in cutting and washing.

Planning something similar?
Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.