A Gym Chain approached us with a jacket lining fabric interlining lining requirement for Spain. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Minimum order quantities far above what a growing brand can absorb
- Long lead times that miss the selling season
- Inconsistent sizing between production runs

What we specified
| Product | Jacket Lining Fabric Interlining Lining |
|---|---|
| Client type | A Gym Chain |
| Market | Spain |
| Order volume | 5,000 pieces across 2 colourways |
| Base fabric | Mesh |
| Decoration | Garment Dyeing |
| Size range | XS-3XL |
| Sampling rounds | 2 |
| Delivery window | 12 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Mesh and locked shrinkage allowance before grading.
- Decoration was moved to Garment Dyeing after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 5,000 pieces delivered inside the 12-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.