Case Study: Custom Joma Training Wear for a Trade Show Exhibitor in Taiwan
Source:Joma Training Wear /
Time:2026-09-18
Joma Training Wear for a Trade Show Exhibitor in Taiwan
A Trade Show Exhibitor approached us with a joma training wear requirement for Taiwan. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Long lead times that miss the selling season
- Unclear responsibility when a defect shows up after washing
- Minimum order quantities far above what a growing brand can absorb

What we specified
| Product | Joma Training Wear |
|---|---|
| Client type | A Trade Show Exhibitor |
| Market | Taiwan |
| Order volume | 800 pieces across 4 colourways |
| Base fabric | 3-Layer Waterproof Fabric |
| Decoration | Bonding Construction |
| Size range | Custom grading |
| Sampling rounds | 2 |
| Delivery window | 10 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around 3-Layer Waterproof Fabric and locked shrinkage allowance before grading.
- Decoration was moved to Bonding Construction after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 800 pieces delivered inside the 10-week window.
- Unit cost held within 2.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Book a 20-minute call with our merchandising team and get a written quotation within 48 hours.



