Case Study: Custom Lace Underpants for a Government Agency in Denmark
Lace Underpants for a Government Agency in Denmark
A Government Agency approached us with a lace underpants requirement for Denmark. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Long lead times that miss the selling season
- Unclear responsibility when a defect shows up after washing
- No reliable way to track a order once it enters production

What we specified
| Product | Lace Underpants |
|---|---|
| Client type | A Government Agency |
| Market | Denmark |
| Order volume | 8,000 pieces across 4 colourways |
| Base fabric | Modal |
| Decoration | Sequin Work |
| Size range | S-4XL |
| Sampling rounds | 2 |
| Delivery window | 12 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Modal and locked shrinkage allowance before grading.
- Decoration was moved to Sequin Work after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 8,000 pieces delivered inside the 12-week window.
- Unit cost held within 4.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample from the actual bulk fabric. Proto cloth behaves differently in cutting and washing.

Planning something similar?
Book a 20-minute call with our merchandising team and get a written quotation within 48 hours.



