Case Study: Custom Maternity Compression Stockings for a Wholesale Distributor in Japan
Maternity Compression Stockings for a Wholesale Distributor in Japan
A Wholesale Distributor approached us with a maternity compression stockings requirement for Japan. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Unclear responsibility when a defect shows up after washing
- Packaging that arrives crushed and unsellable
- Suppliers who disappear once the deposit is paid

What we specified
| Product | Maternity Compression Stockings |
|---|---|
| Client type | A Wholesale Distributor |
| Market | Japan |
| Order volume | 800 pieces across 4 colourways |
| Base fabric | Ripstop Nylon |
| Decoration | Snow Wash |
| Size range | S-4XL |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Ripstop Nylon and locked shrinkage allowance before grading.
- Decoration was moved to Snow Wash after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 800 pieces delivered inside the 8-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Fix the size ratio early. Changing the ratio after cutting starts is the single most expensive change a client can request.

Planning something similar?
Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.



