Case Study: Custom Protective Clothing Factory Dress With Ppe for a Bridal Studio in Denmark
Protective Clothing Factory Dress With Ppe for a Bridal Studio in Denmark
A Bridal Studio approached us with a protective clothing factory dress with ppe requirement for Denmark. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Minimum order quantities far above what a growing brand can absorb
- No reliable way to track a order once it enters production
- Packaging that arrives crushed and unsellable

What we specified
| Product | Protective Clothing Factory Dress With Ppe |
|---|---|
| Client type | A Bridal Studio |
| Market | Denmark |
| Order volume | 2,000 pieces across 6 colourways |
| Base fabric | Chambray |
| Decoration | Enzyme Wash |
| Size range | Custom grading |
| Sampling rounds | 4 |
| Delivery window | 5 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Chambray and locked shrinkage allowance before grading.
- Decoration was moved to Enzyme Wash after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 2,000 pieces delivered inside the 5-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample from the actual bulk fabric. Proto cloth behaves differently in cutting and washing.

Planning something similar?
Book a 20-minute call with our merchandising team and get a written quotation within 48 hours.



