Case Study: Custom Protective Clothing Factory Dress With Ppe for a Dance School in Argentina
Protective Clothing Factory Dress With Ppe for a Dance School in Argentina
A Dance School approached us with a protective clothing factory dress with ppe requirement for Argentina. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Packaging that arrives crushed and unsellable
- Inconsistent sizing between production runs
- Unclear responsibility when a defect shows up after washing

What we specified
| Product | Protective Clothing Factory Dress With Ppe |
|---|---|
| Client type | A Dance School |
| Market | Argentina |
| Order volume | 5,000 pieces across 6 colourways |
| Base fabric | Recycled Nylon |
| Decoration | Rhinestone Application |
| Size range | S-4XL |
| Sampling rounds | 2 |
| Delivery window | 12 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Recycled Nylon and locked shrinkage allowance before grading.
- Decoration was moved to Rhinestone Application after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 5,000 pieces delivered inside the 12-week window.
- Unit cost held within 2.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample from the actual bulk fabric. Proto cloth behaves differently in cutting and washing.

Planning something similar?
Book a 20-minute call with our merchandising team and get a written quotation within 48 hours.



