Case Study: Custom Silk Bonnet for a Government Agency in Morocco
Source:Silk Bonnet /
Time:2026-09-18
Silk Bonnet for a Government Agency in Morocco
A Government Agency approached us with a silk bonnet requirement for Morocco. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Minimum order quantities far above what a growing brand can absorb
- Color drift between lab dips and bulk fabric
- Inconsistent sizing between production runs

What we specified
| Product | Silk Bonnet |
|---|---|
| Client type | A Government Agency |
| Market | Morocco |
| Order volume | 2,000 pieces across 3 colourways |
| Base fabric | Corduroy |
| Decoration | Custom Zip Puller |
| Size range | Custom grading |
| Sampling rounds | 2 |
| Delivery window | 10 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Corduroy and locked shrinkage allowance before grading.
- Decoration was moved to Custom Zip Puller after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 2,000 pieces delivered inside the 10-week window.
- Unit cost held within 2.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



