Case Study: Custom Cycling Jersey for a Wholesale Distributor in Argentina
Cycling Jersey for a Wholesale Distributor in Argentina
A Wholesale Distributor approached us with a cycling jersey requirement for Argentina. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- No reliable way to track a order once it enters production
- Color drift between lab dips and bulk fabric
- Unclear responsibility when a defect shows up after washing

What we specified
| Product | Cycling Jersey |
|---|---|
| Client type | A Wholesale Distributor |
| Market | Argentina |
| Order volume | 500 pieces across 6 colourways |
| Base fabric | Lace |
| Decoration | Tie-Dye Wash |
| Size range | 2-12Y |
| Sampling rounds | 2 |
| Delivery window | 8 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Lace and locked shrinkage allowance before grading.
- Decoration was moved to Tie-Dye Wash after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 500 pieces delivered inside the 8-week window.
- Unit cost held within 1.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



