Case Study: Custom Joma Training Wear for an Independent Fashion Designer in South Korea
Joma Training Wear for an Independent Fashion Designer in South Korea
An Independent Fashion Designer approached us with a joma training wear requirement for South Korea. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- No reliable way to track a order once it enters production
- Long lead times that miss the selling season
- Unclear responsibility when a defect shows up after washing

What we specified
| Product | Joma Training Wear |
|---|---|
| Client type | An Independent Fashion Designer |
| Market | South Korea |
| Order volume | 500 pieces across 3 colourways |
| Base fabric | Organic Cotton |
| Decoration | Yarn Dyeing |
| Size range | 2-12Y |
| Sampling rounds | 3 |
| Delivery window | 5 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Organic Cotton and locked shrinkage allowance before grading.
- Decoration was moved to Yarn Dyeing after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 500 pieces delivered inside the 5-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the colour standard before grading. Once a shade moves, every downstream approval has to be redone and the calendar slips.

Planning something similar?
Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.



