Case Study: Custom Lace Underpants for a Cruise Line in Singapore
Lace Underpants for a Cruise Line in Singapore
A Cruise Line approached us with a lace underpants requirement for Singapore. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- No reliable way to track a order once it enters production
- Long lead times that miss the selling season
- Packaging that arrives crushed and unsellable

What we specified
| Product | Lace Underpants |
|---|---|
| Client type | A Cruise Line |
| Market | Singapore |
| Order volume | 8,000 pieces across 3 colourways |
| Base fabric | Denim |
| Decoration | Applique Embroidery |
| Size range | XS-3XL |
| Sampling rounds | 3 |
| Delivery window | 8 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Denim and locked shrinkage allowance before grading.
- Decoration was moved to Applique Embroidery after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 8,000 pieces delivered inside the 8-week window.
- Unit cost held within 1.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the colour standard before grading. Once a shade moves, every downstream approval has to be redone and the calendar slips.

Planning something similar?
Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.