Case Study: Custom Multi Station Gym Fitness Set for an Event Management Company in Thailand
Multi Station Gym Fitness Set for an Event Management Company in Thailand
An Event Management Company approached us with a multi station gym fitness set requirement for Thailand. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Long lead times that miss the selling season
- Unclear responsibility when a defect shows up after washing
- Packaging that arrives crushed and unsellable

What we specified
| Product | Multi Station Gym Fitness Set |
|---|---|
| Client type | An Event Management Company |
| Market | Thailand |
| Order volume | 800 pieces across 3 colourways |
| Base fabric | Moisture-Wicking Knit |
| Decoration | Laser Cutting |
| Size range | XS-3XL |
| Sampling rounds | 2 |
| Delivery window | 6 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Moisture-Wicking Knit and locked shrinkage allowance before grading.
- Decoration was moved to Laser Cutting after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 800 pieces delivered inside the 6-week window.
- Unit cost held within 1.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the colour standard before grading. Once a shade moves, every downstream approval has to be redone and the calendar slips.

Planning something similar?
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.