Case Study: Custom Multi Station Gym Fitness Set for a Bridal Studio in China
Multi Station Gym Fitness Set for a Bridal Studio in China
A Bridal Studio approached us with a multi station gym fitness set requirement for China. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- No reliable way to track a order once it enters production
- Minimum order quantities far above what a growing brand can absorb
- Suppliers who disappear once the deposit is paid

What we specified
| Product | Multi Station Gym Fitness Set |
|---|---|
| Client type | A Bridal Studio |
| Market | China |
| Order volume | 800 pieces across 6 colourways |
| Base fabric | Wool Blend |
| Decoration | Satin Printed Label |
| Size range | XS-3XL |
| Sampling rounds | 3 |
| Delivery window | 5 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Wool Blend and locked shrinkage allowance before grading.
- Decoration was moved to Satin Printed Label after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 800 pieces delivered inside the 5-week window.
- Unit cost held within 1.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the colour standard before grading. Once a shade moves, every downstream approval has to be redone and the calendar slips.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



