Case Study: Custom Pink Baby Socks for a Boutique Fitness Studio in Taiwan
Pink Baby Socks for a Boutique Fitness Studio in Taiwan
A Boutique Fitness Studio approached us with a pink baby socks requirement for Taiwan. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Packaging that arrives crushed and unsellable
- Long lead times that miss the selling season
- Inconsistent sizing between production runs

What we specified
| Product | Pink Baby Socks |
|---|---|
| Client type | A Boutique Fitness Studio |
| Market | Taiwan |
| Order volume | 5,000 pieces across 6 colourways |
| Base fabric | Wool Blend |
| Decoration | Contrast Stitching |
| Size range | S-4XL |
| Sampling rounds | 3 |
| Delivery window | 6 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Wool Blend and locked shrinkage allowance before grading.
- Decoration was moved to Contrast Stitching after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 5,000 pieces delivered inside the 6-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



