Case Study: Custom Pink Prom Dresses for a Cycling Team in Indonesia
Pink Prom Dresses for a Cycling Team in Indonesia
A Cycling Team approached us with a pink prom dresses requirement for Indonesia. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Packaging that arrives crushed and unsellable
- Unclear responsibility when a defect shows up after washing
- Inconsistent sizing between production runs

What we specified
| Product | Pink Prom Dresses |
|---|---|
| Client type | A Cycling Team |
| Market | Indonesia |
| Order volume | 3,000 pieces across 4 colourways |
| Base fabric | Cotton-Poly Blend |
| Decoration | Custom Button |
| Size range | S-4XL |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Cotton-Poly Blend and locked shrinkage allowance before grading.
- Decoration was moved to Custom Button after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 3,000 pieces delivered inside the 8-week window.
- Unit cost held within 4.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Fix the size ratio early. Changing the ratio after cutting starts is the single most expensive change a client can request.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



