Case Study: Custom Protective Clothing Factory Dress With Ppe for a Film Production House in Brazil
Protective Clothing Factory Dress With Ppe for a Film Production House in Brazil
A Film Production House approached us with a protective clothing factory dress with ppe requirement for Brazil. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Inconsistent sizing between production runs
- Unclear responsibility when a defect shows up after washing
- No reliable way to track a order once it enters production

What we specified
| Product | Protective Clothing Factory Dress With Ppe |
|---|---|
| Client type | A Film Production House |
| Market | Brazil |
| Order volume | 800 pieces across 3 colourways |
| Base fabric | Satin |
| Decoration | Ribbed Cuff and Hem |
| Size range | Custom grading |
| Sampling rounds | 4 |
| Delivery window | 10 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Satin and locked shrinkage allowance before grading.
- Decoration was moved to Ribbed Cuff and Hem after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 800 pieces delivered inside the 10-week window.
- Unit cost held within 4.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.