Case Study: Custom Uv Protection Cycling Hat for a Security Company in Spain
Source:Uv Protection Cycling Hat /
Time:2026-09-18
Uv Protection Cycling Hat for a Security Company in Spain
A Security Company approached us with a uv protection cycling hat requirement for Spain. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Packaging that arrives crushed and unsellable
- Inconsistent sizing between production runs
- No reliable way to track a order once it enters production

What we specified
| Product | Uv Protection Cycling Hat |
|---|---|
| Client type | A Security Company |
| Market | Spain |
| Order volume | 3,000 pieces across 4 colourways |
| Base fabric | Satin |
| Decoration | Placement Printing |
| Size range | 2-12Y |
| Sampling rounds | 3 |
| Delivery window | 12 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Satin and locked shrinkage allowance before grading.
- Decoration was moved to Placement Printing after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 3,000 pieces delivered inside the 12-week window.
- Unit cost held within 1.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.