Elevated Girls Denim Bomber Style Jacket in Metallic Thread with Crystal Embellishment
Elevated Girls Denim Bomber Style Jacket in Metallic Thread with Crystal Embellishment
A Uniform Supplier approached us to develop a elevated girls denim bomber style jacket around a single idea: crystal embellishment, executed in metallic thread. The capsule was destined for the United Arab Emirates and needed elevated finishing that reads designer on the rail while staying repeatable in bulk. This case study records the brief, the specification and the delivery.
The challenge
- The sample did not match the runway reference
- Unit costs were too high for a boutique price point
- Fabric hand feel changed between production runs

What we specified
| Product | Elevated Girls Denim Bomber Style Jacket |
|---|---|
| Client type | A Uniform Supplier |
| Market | the United Arab Emirates |
| Order volume | 400 pieces across 5 colourways |
| Base material | Metallic Thread |
| Signature detail | Crystal Embellishment |
| Size range | XS-3XL |
| Sampling rounds | 4 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | WRAP |
How it was built
- Reference garments and moodboards were translated into a measurement spec, not just photos.
- Metallic Thread was confirmed with lab dips and a hand-feel approval before grading.
- The girls denim bomber style jacket was prototyped on the fit model, then revised twice before pre-production.
- Crystal Embellishment was applied in a controlled process to keep every piece consistent.
- Bulk ran with in-line inspection; a photo report was shared before shipment.

Result
- 400 pieces delivered inside the 10-week window.
- Unit cost held within 1.5% of the approved quotation.
- The a Uniform Supplier launched on schedule and reordered the same specification next season.
What we would repeat
Approve the hand feel on the actual bulk fabric — proto cloth always behaves differently.

Planning a similar capsule?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



