Parisian Jacket Lining Fabric Interlining Lining in Washed Linen with Padded Shoulder
Parisian Jacket Lining Fabric Interlining Lining in Washed Linen with Padded Shoulder
A Construction Firm approached us to develop a parisian jacket lining fabric interlining lining around a single idea: padded shoulder, executed in washed linen. The capsule was destined for Italy and needed parisian finishing that reads designer on the rail while staying repeatable in bulk. This case study records the brief, the specification and the delivery.
The challenge
- Decoration durability failed after two washes
- The previous factory could not hold consistency across sizes
- Unit costs were too high for a boutique price point

What we specified
| Product | Parisian Jacket Lining Fabric Interlining Lining |
|---|---|
| Client type | A Construction Firm |
| Market | Italy |
| Order volume | 400 pieces across 2 colourways |
| Base material | Washed Linen |
| Signature detail | Padded Shoulder |
| Size range | Custom grading |
| Sampling rounds | 3 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | BSCI |
How it was built
- Reference garments and moodboards were translated into a measurement spec, not just photos.
- Washed Linen was confirmed with lab dips and a hand-feel approval before grading.
- The jacket lining fabric interlining lining was prototyped on the fit model, then revised twice before pre-production.
- Padded Shoulder was applied in a controlled process to keep every piece consistent.
- Bulk ran with in-line inspection; a photo report was shared before shipment.

Result
- 400 pieces delivered inside the 10-week window.
- Unit cost held within 1.5% of the approved quotation.
- The a Construction Firm launched on schedule and reordered the same specification next season.
What we would repeat
Approve the hand feel on the actual bulk fabric — proto cloth always behaves differently.

Planning a similar capsule?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



