Shirt Dress Customization Program for Government and Municipal with Flat Embroidery
Shirt Dress Customization Program for Government and Municipal
This programme covers the full path from a shirt dress concept to repeatable bulk supply for government and municipal. The build starts from everyday-casual references — shirt dress in fleece-back cotton — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most shirt dress buyers arrive with one of these problems: colour faded after a few washes, or the fabric felt thinner than the approved sample. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Shirt Dress |
|---|---|
| Base fabric | Fleece-Back Cotton |
| Decoration | Flat Embroidery |
| Fabric weight | 320-360 gsm |
| Fit options | High-rise / Mid-rise |
| Colour options | 12 wash-stable shades |
| MOQ | 200 pieces per style per colour |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 30-50 days after approval |
| Compliance | WRAP |
What you can customise
- Bonding Construction — quoted per position and per colour on Fleece-Back Cotton.
- Custom Zip Puller — quoted per position and per colour on Fleece-Back Cotton.
- Contrast Stitching — quoted per position and per colour on Fleece-Back Cotton.
- DTG Digital Printing — quoted per position and per colour on Fleece-Back Cotton.
- 3D Puff Embroidery — quoted per position and per colour on Fleece-Back Cotton.
- Glow-in-the-Dark Printing — quoted per position and per colour on Fleece-Back Cotton.
- Ruching — quoted per position and per colour on Fleece-Back Cotton.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Fleece-Back Cotton-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with flat embroidery applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Shirt Dress reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
Do you provide compliance documents?
We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for WRAP, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.
How is shipping handled?
We quote EXW, FOB, CIF and DDP. Consolidated sea freight is the default for bulk programmes, with air or express options when a launch date is at risk.
How long does sampling take?
A first prototype is typically ready in 7 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.
Can you match a specific colour?
Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.
Start your shirt dress programme
Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.



