Bike Short Customization Program for Workwear and Industrial with Woven Label
Bike Short Customization Program for Workwear and Industrial
This programme covers the full path from a bike short concept to repeatable bulk supply for workwear and industrial. The build starts from everyday-casual references — bike short in fleece-back cotton — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most bike short buyers arrive with one of these problems: delivery missed the season drop, or the fit drifted between sizes. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Bike Short |
|---|---|
| Base fabric | Fleece-Back Cotton |
| Decoration | Woven Label |
| Fabric weight | 160-180 gsm |
| Fit options | High-rise / Mid-rise |
| Colour options | 16 wash-stable shades |
| MOQ | 500 pieces per style per colour |
| Sampling | 12 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | WRAP |
What you can customise
- All-Over Sublimation — quoted per position and per colour on Fleece-Back Cotton.
- Screen Printing — quoted per position and per colour on Fleece-Back Cotton.
- Custom Button — quoted per position and per colour on Fleece-Back Cotton.
- 3D Puff Embroidery — quoted per position and per colour on Fleece-Back Cotton.
- Care Label — quoted per position and per colour on Fleece-Back Cotton.
- Beading and Embroidery — quoted per position and per colour on Fleece-Back Cotton.
- Custom Zip Puller — quoted per position and per colour on Fleece-Back Cotton.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Fleece-Back Cotton-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with woven label applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Bike Short reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
How long does sampling take?
A first prototype is typically ready in 12 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.
Can you match a specific colour?
Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.
What is the minimum order quantity?
Standard programmes start at 500 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.
How is shipping handled?
We quote EXW, FOB, CIF and DDP. Consolidated sea freight is the default for bulk programmes, with air or express options when a launch date is at risk.
Start your bike short programme
Book a 20-minute call with our merchandising team and get a written quotation within 48 hours.



