Basic Tee Customization Program for Sports Teams and Clubs with Flat Embroidery
Basic Tee Customization Program for Sports Teams and Clubs
This programme covers the full path from a basic tee concept to repeatable bulk supply for sports teams and clubs. The build starts from everyday-casual references — basic tee in ribbed cotton — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most basic tee buyers arrive with one of these problems: the previous supplier could not hold consistency on reorders, or colour faded after a few washes. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Basic Tee |
|---|---|
| Base fabric | Ribbed Cotton |
| Decoration | Flat Embroidery |
| Fabric weight | 240-280 gsm |
| Fit options | Custom grading |
| Colour options | 6 wash-stable shades |
| MOQ | 500 pieces per style per colour |
| Sampling | 10 working days, 4 days per revision |
| Bulk lead time | 20-50 days after approval |
| Compliance | WRAP |
What you can customise
- Tie-Dye Wash — quoted per position and per colour on Ribbed Cotton.
- Yarn Dyeing — quoted per position and per colour on Ribbed Cotton.
- Chenille Embroidery — quoted per position and per colour on Ribbed Cotton.
- Quilting — quoted per position and per colour on Ribbed Cotton.
- Pleating — quoted per position and per colour on Ribbed Cotton.
- Heat Transfer Printing — quoted per position and per colour on Ribbed Cotton.
- Piping and Binding — quoted per position and per colour on Ribbed Cotton.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Ribbed Cotton-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with flat embroidery applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Basic Tee reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
What is the minimum order quantity?
Standard programmes start at 500 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.
Do you provide compliance documents?
We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for WRAP, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.
Can you match a specific colour?
Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.
How long does sampling take?
A first prototype is typically ready in 10 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 4 days each.
Start your basic tee programme
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



