Boardshort Customization Program for Construction Sites with Tonal Embroidery
Boardshort Customization Program for Construction Sites
This programme covers the full path from a boardshort concept to repeatable bulk supply for construction sites. The build starts from everyday-casual references — boardshort in fleece-back cotton — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most boardshort buyers arrive with one of these problems: delivery missed the season drop, or the fit drifted between sizes. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Boardshort |
|---|---|
| Base fabric | Fleece-Back Cotton |
| Decoration | Tonal Embroidery |
| Fabric weight | 200-220 gsm |
| Fit options | Custom grading |
| Colour options | 12 wash-stable shades |
| MOQ | 500 pieces per style per colour |
| Sampling | 12 working days, 4 days per revision |
| Bulk lead time | 20-50 days after approval |
| Compliance | OEKO-TEX Standard 100 |
What you can customise
- Acid Wash — quoted per position and per colour on Fleece-Back Cotton.
- Care Label — quoted per position and per colour on Fleece-Back Cotton.
- Tonal Embroidery — quoted per position and per colour on Fleece-Back Cotton.
- Distressed Finish — quoted per position and per colour on Fleece-Back Cotton.
- Embossing — quoted per position and per colour on Fleece-Back Cotton.
- Screen Printing — quoted per position and per colour on Fleece-Back Cotton.
- Contrast Stitching — quoted per position and per colour on Fleece-Back Cotton.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Fleece-Back Cotton-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with tonal embroidery applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Boardshort reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
Can you match a specific colour?
Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.
How long does sampling take?
A first prototype is typically ready in 12 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 4 days each.
Do you provide compliance documents?
We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for OEKO-TEX Standard 100, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.
How is shipping handled?
We quote EXW, FOB, CIF and DDP. Consolidated sea freight is the default for bulk programmes, with air or express options when a launch date is at risk.
Start your boardshort programme
Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.



