Welcome to Apparel & Accessories official website!

Chino Pant Customization Program for Beauty and Cosmetics with Beading and Embroidery

Source:Solution / Time:2026-10-01

Chino Pant Customization Program for Beauty and Cosmetics

This programme covers the full path from a chino pant concept to repeatable bulk supply for beauty and cosmetics. The build starts from everyday-casual references — chino pant in fleece-back cotton — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.

Most chino pant buyers arrive with one of these problems: delivery missed the season drop, or colour faded after a few washes. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Chino Pant for Beauty and Cosmetics

Specification

ProductChino Pant
Base fabricFleece-Back Cotton
DecorationBeading and Embroidery
Fabric weight240-280 gsm
Fit optionsRegular / Relaxed / Oversized
Colour options6 wash-stable shades
MOQ300 pieces per style per colour
Sampling10 working days, 4 days per revision
Bulk lead time30-50 days after approval
ComplianceWRAP

What you can customise

  • Dye-Sublimation Printing — quoted per position and per colour on Fleece-Back Cotton.
  • Flat Embroidery — quoted per position and per colour on Fleece-Back Cotton.
  • DTG Digital Printing — quoted per position and per colour on Fleece-Back Cotton.
  • Custom Button — quoted per position and per colour on Fleece-Back Cotton.
  • Tie-Dye Wash — quoted per position and per colour on Fleece-Back Cotton.
  • Ruching — quoted per position and per colour on Fleece-Back Cotton.
  • Laser Cutting — quoted per position and per colour on Fleece-Back Cotton.

Chino Pant Beading and Embroidery detail

How we produce it

  1. Tech pack review, fabric confirmation and lab dip approval
  2. Pattern, grading and a Fleece-Back Cotton-spec prototype
  3. Fit sample and wearer test, then pre-production sign-off
  4. Bulk cutting with beading and embroidery applied under controlled settings
  5. In-line inspection, final AQL 2.5 check and packing

Quality control

Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Chino Pant reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.

FAQ

How is shipping handled?

We quote EXW, FOB, CIF and DDP. Consolidated sea freight is the default for bulk programmes, with air or express options when a launch date is at risk.

Do you provide compliance documents?

We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for WRAP, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.

How long does sampling take?

A first prototype is typically ready in 10 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 4 days each.

Can you match a specific colour?

Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.

Start your chino pant programme

Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top