Polo Shirt Customization Program for Construction Sites with Hangtag and Packaging
Polo Shirt Customization Program for Construction Sites
This programme covers the full path from a polo shirt concept to repeatable bulk supply for construction sites. The build starts from everyday-casual references — polo shirt in linen blend — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most polo shirt buyers arrive with one of these problems: the previous supplier could not hold consistency on reorders, or delivery missed the season drop. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Polo Shirt |
|---|---|
| Base fabric | Linen Blend |
| Decoration | Hangtag and Packaging |
| Fabric weight | 240-280 gsm |
| Fit options | High-rise / Mid-rise |
| Colour options | 12 wash-stable shades |
| MOQ | 500 pieces per style per colour |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 30-60 days after approval |
| Compliance | WRAP |
What you can customise
- Custom Drawcord — quoted per position and per colour on Linen Blend.
- Snow Wash — quoted per position and per colour on Linen Blend.
- Sequin Work — quoted per position and per colour on Linen Blend.
- Enzyme Wash — quoted per position and per colour on Linen Blend.
- Garment Dyeing — quoted per position and per colour on Linen Blend.
- Laser Cutting — quoted per position and per colour on Linen Blend.
- Hangtag and Packaging — quoted per position and per colour on Linen Blend.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Linen Blend-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with hangtag and packaging applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Polo Shirt reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
Do you provide compliance documents?
We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for WRAP, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.
What file formats do you need for artwork?
Vector files (AI, EPS, PDF) give the best print and embroidery results. For raster artwork please supply at least 300 dpi at the final print size. We digitise embroidery files in-house and return a sew-out photo for approval.
How long does sampling take?
A first prototype is typically ready in 7 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.
What is the minimum order quantity?
Standard programmes start at 500 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.
Start your polo shirt programme
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



