Shirt Dress Customization Program for Construction Sites with Ribbed Cuff and Hem
Shirt Dress Customization Program for Construction Sites
This programme covers the full path from a shirt dress concept to repeatable bulk supply for construction sites. The build starts from everyday-casual references — shirt dress in modal blend — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most shirt dress buyers arrive with one of these problems: delivery missed the season drop, or the fabric felt thinner than the approved sample. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Shirt Dress |
|---|---|
| Base fabric | Modal Blend |
| Decoration | Ribbed Cuff and Hem |
| Fabric weight | 200-220 gsm |
| Fit options | Regular / Relaxed / Oversized |
| Colour options | 12 wash-stable shades |
| MOQ | 500 pieces per style per colour |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | ISO 9001 |
What you can customise
- Ruching — quoted per position and per colour on Modal Blend.
- DTF Film Printing — quoted per position and per colour on Modal Blend.
- Care Label — quoted per position and per colour on Modal Blend.
- Seam Sealing — quoted per position and per colour on Modal Blend.
- Applique Embroidery — quoted per position and per colour on Modal Blend.
- Flocking — quoted per position and per colour on Modal Blend.
- Placement Printing — quoted per position and per colour on Modal Blend.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Modal Blend-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with ribbed cuff and hem applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Shirt Dress reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
How long does sampling take?
A first prototype is typically ready in 10 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.
What file formats do you need for artwork?
Vector files (AI, EPS, PDF) give the best print and embroidery results. For raster artwork please supply at least 300 dpi at the final print size. We digitise embroidery files in-house and return a sew-out photo for approval.
What is the minimum order quantity?
Standard programmes start at 500 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.
Can you match a specific colour?
Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.
Start your shirt dress programme
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



