Drawstring Short Customization Program for Boutique and Independent Labels with Screen Printing
Drawstring Short Customization Program for Boutique and Independent Labels
This programme covers the full path from a drawstring short concept to repeatable bulk supply for boutique and independent labels. The build starts from everyday-casual references — drawstring short in corduroy — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most drawstring short buyers arrive with one of these problems: colour faded after a few washes, or the previous supplier could not hold consistency on reorders. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Drawstring Short |
|---|---|
| Base fabric | Corduroy |
| Decoration | Screen Printing |
| Fabric weight | 200-220 gsm |
| Fit options | High-rise / Mid-rise |
| Colour options | 8 wash-stable shades |
| MOQ | 800 pieces per style per colour |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | WRAP |
What you can customise
- Screen Printing — quoted per position and per colour on Corduroy.
- Snow Wash — quoted per position and per colour on Corduroy.
- Pantone Color Matching — quoted per position and per colour on Corduroy.
- Piece Dyeing — quoted per position and per colour on Corduroy.
- Bonding Construction — quoted per position and per colour on Corduroy.
- Ruching — quoted per position and per colour on Corduroy.
- Hangtag and Packaging — quoted per position and per colour on Corduroy.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Corduroy-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with screen printing applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Drawstring Short reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
Can you match a specific colour?
Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.
Do you provide compliance documents?
We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for WRAP, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.
How long does sampling take?
A first prototype is typically ready in 7 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.
What file formats do you need for artwork?
Vector files (AI, EPS, PDF) give the best print and embroidery results. For raster artwork please supply at least 300 dpi at the final print size. We digitise embroidery files in-house and return a sew-out photo for approval.
Start your drawstring short programme
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



