Basic Tee Customization Program for Esports and Gaming with Contrast Stitching
Basic Tee Customization Program for Esports and Gaming
This programme covers the full path from a basic tee concept to repeatable bulk supply for esports and gaming. The build starts from everyday-casual references — basic tee in corduroy — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most basic tee buyers arrive with one of these problems: the fabric felt thinner than the approved sample, or the fit drifted between sizes. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Basic Tee |
|---|---|
| Base fabric | Corduroy |
| Decoration | Contrast Stitching |
| Fabric weight | 200-220 gsm |
| Fit options | Custom grading |
| Colour options | 12 wash-stable shades |
| MOQ | 200 pieces per style per colour |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | WRAP |
What you can customise
- Rhinestone Application — quoted per position and per colour on Corduroy.
- Flat Embroidery — quoted per position and per colour on Corduroy.
- Quilting — quoted per position and per colour on Corduroy.
- Distressed Finish — quoted per position and per colour on Corduroy.
- Stone Wash — quoted per position and per colour on Corduroy.
- Sequin Work — quoted per position and per colour on Corduroy.
- Embossing — quoted per position and per colour on Corduroy.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Corduroy-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with contrast stitching applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Basic Tee reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
What is the minimum order quantity?
Standard programmes start at 200 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.
Can you match a specific colour?
Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.
How is shipping handled?
We quote EXW, FOB, CIF and DDP. Consolidated sea freight is the default for bulk programmes, with air or express options when a launch date is at risk.
How long does sampling take?
A first prototype is typically ready in 7 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.
Start your basic tee programme
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



