Welcome to Apparel & Accessories official website!

Chino Pant Customization Program for Event Management with Screen Printing

Source:Solution / Time:2026-10-01

Chino Pant Customization Program for Event Management

This programme covers the full path from a chino pant concept to repeatable bulk supply for event management. The build starts from everyday-casual references — chino pant in french terry — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.

Most chino pant buyers arrive with one of these problems: wholesale costs squeezed the retail margin, or wholesale costs squeezed the retail margin. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Chino Pant for Event Management

Specification

ProductChino Pant
Base fabricFrench Terry
DecorationScreen Printing
Fabric weight200-220 gsm
Fit optionsRegular / Relaxed / Oversized
Colour options6 wash-stable shades
MOQ100 pieces per style per colour
Sampling10 working days, 3 days per revision
Bulk lead time20-40 days after approval
ComplianceOEKO-TEX Standard 100

What you can customise

  • Custom Zip Puller — quoted per position and per colour on French Terry.
  • Garment Dyeing — quoted per position and per colour on French Terry.
  • Custom Drawcord — quoted per position and per colour on French Terry.
  • Yarn Dyeing — quoted per position and per colour on French Terry.
  • Heat Transfer Printing — quoted per position and per colour on French Terry.
  • Custom Button — quoted per position and per colour on French Terry.
  • Ultrasonic Welding — quoted per position and per colour on French Terry.

Chino Pant Screen Printing detail

How we produce it

  1. Tech pack review, fabric confirmation and lab dip approval
  2. Pattern, grading and a French Terry-spec prototype
  3. Fit sample and wearer test, then pre-production sign-off
  4. Bulk cutting with screen printing applied under controlled settings
  5. In-line inspection, final AQL 2.5 check and packing

Quality control

Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Chino Pant reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.

FAQ

How long does sampling take?

A first prototype is typically ready in 10 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.

Can you match a specific colour?

Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.

What is the minimum order quantity?

Standard programmes start at 100 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.

What file formats do you need for artwork?

Vector files (AI, EPS, PDF) give the best print and embroidery results. For raster artwork please supply at least 300 dpi at the final print size. We digitise embroidery files in-house and return a sew-out photo for approval.

Start your chino pant programme

Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top