Welcome to Apparel & Accessories official website!

Drawstring Short Customization Program for Manufacturing Plants with Yarn Dyeing

Source:Solution / Time:2026-10-01

Drawstring Short Customization Program for Manufacturing Plants

This programme covers the full path from a drawstring short concept to repeatable bulk supply for manufacturing plants. The build starts from everyday-casual references — drawstring short in fleece-back cotton — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.

Most drawstring short buyers arrive with one of these problems: colour faded after a few washes, or wholesale costs squeezed the retail margin. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Drawstring Short for Manufacturing Plants

Specification

ProductDrawstring Short
Base fabricFleece-Back Cotton
DecorationYarn Dyeing
Fabric weight320-360 gsm
Fit optionsXS-3XL
Colour options6 wash-stable shades
MOQ300 pieces per style per colour
Sampling7 working days, 3 days per revision
Bulk lead time20-40 days after approval
ComplianceGOTS

What you can customise

  • Ribbed Cuff and Hem — quoted per position and per colour on Fleece-Back Cotton.
  • Tie-Dye Wash — quoted per position and per colour on Fleece-Back Cotton.
  • 3D Puff Embroidery — quoted per position and per colour on Fleece-Back Cotton.
  • Puff Printing — quoted per position and per colour on Fleece-Back Cotton.
  • Reflective Printing — quoted per position and per colour on Fleece-Back Cotton.
  • Beading and Embroidery — quoted per position and per colour on Fleece-Back Cotton.
  • Pantone Color Matching — quoted per position and per colour on Fleece-Back Cotton.

Drawstring Short Yarn Dyeing detail

How we produce it

  1. Tech pack review, fabric confirmation and lab dip approval
  2. Pattern, grading and a Fleece-Back Cotton-spec prototype
  3. Fit sample and wearer test, then pre-production sign-off
  4. Bulk cutting with yarn dyeing applied under controlled settings
  5. In-line inspection, final AQL 2.5 check and packing

Quality control

Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Drawstring Short reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.

FAQ

What is the minimum order quantity?

Standard programmes start at 300 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.

Can you match a specific colour?

Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.

Do you provide compliance documents?

We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for GOTS, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.

How long does sampling take?

A first prototype is typically ready in 7 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.

Start your drawstring short programme

Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top