Custom Shoulder Pad — Mesh with Heat-Cut Edge
We supply shoulder pad to garment factories and brands, built in Mesh with heat-cut edge for denim and workwear programmes. On a trim like this the specification that decides the outcome is wash stability of the foam, so that is agreed in writing before bulk — not discovered when the first carton is opened on the line. Programmes start at 5000 pieces per style per finish.
The failures here are predictable: a finish that tarnishes or rubs off after washing, or inconsistent sizing between production runs. We lock material, finish, dimension and tolerance before bulk, and prepare GB 18401 safety classification with GB/T 29862 fibre labelling so the shipment clears instead of sitting at port while your selling season passes.

Specification
| Product | Shoulder Pad |
|---|---|
| Thickness | 15 mm |
| Type | covered pad |
| Base material | Mesh |
| Finish / process | Heat-Cut Edge |
| Colour options | 12 Pantone-matched shades |
| Packing | carded |
| MOQ | 5000 pieces per style per finish |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | GB 18401 safety classification with GB/T 29862 fibre labelling; CPSIA lead and phthalate testing |
| Ship to | Shanghai or Shenzhen (Mainland China) |
What buyers can customise
- Crochet — available on Mesh, quoted per position and per colour.
- Sewn Edge — available on Mesh, quoted per position and per colour.
- Woven Jacquard — available on Mesh, quoted per position and per colour.
- Piece Dyeing — available on Mesh, quoted per position and per colour.
- Rubber Coating — available on Mesh, quoted per position and per colour.
- Heat-Cut Edge — available on Mesh, quoted per position and per colour.
- Braided Weave — available on Mesh, quoted per position and per colour.

How we produce it
- Drawing or reference sample review, with size and finish confirmed
- Material selection and a finish sample or strike-off
- Prototype made to the agreed thickness
- Fit and wash test on the actual garment fabric, then a pre-production sample
- Bulk run with heat-cut edge applied under controlled settings
- In-line inspection, final AQL 2.5 inspection and packing to your ratio
Where it is used
- Denim and workwear — hard-wearing finishes that survive industrial washing
- Outerwear and tailoring — matched to the shell fabric so it drapes with the garment
- Childrenswear and schoolwear — tested to the destination's safety standard
- Bridal and eveningwear — small runs with hand-finished detail
- Uniform and corporate programmes — repeatable spec held on file for reorders

Packing, testing and delivery
Trims are packed to the ratio you specify — by size, by colour or by garment set — with barcodes applied where the line needs them. Test reports for CPSIA lead and phthalate testing are prepared for the destination market. We ship to Shanghai or Shenzhen with the commercial invoice, packing list and certificate of origin, and hold the approved reference so reorders reproduce the same material, the same finish and the same wash stability of the foam.
FAQ
How long does sampling take?
A first sample takes 10 working days, and each revision about 3 days.
How do you control colour on reorders?
The approved reference and the bulk standard are retained, and every reorder is checked against them before shipment.
Which compliance documents do you provide?
We prepare CPSIA lead and phthalate testing and the supporting test reports for the destination market.
What packing options are available?
Bulk packed, carded, or packed to your own size and design ratio with barcodes applied.
Start your shoulder pad programme
If you already have a supplier, send us the last problem you had with them. That is usually where we start.




