Case Study: Custom Long Men Board Short for a Logistics Provider in Qatar
Source:Long Men Board Short /
Time:2026-09-18
Long Men Board Short for a Logistics Provider in Qatar
A Logistics Provider approached us with a long men board short requirement for Qatar. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Inconsistent sizing between production runs
- Long lead times that miss the selling season
- Color drift between lab dips and bulk fabric

What we specified
| Product | Long Men Board Short |
|---|---|
| Client type | A Logistics Provider |
| Market | Qatar |
| Order volume | 8,000 pieces across 3 colourways |
| Base fabric | Bamboo Viscose |
| Decoration | Tie-Dye Wash |
| Size range | S-4XL |
| Sampling rounds | 3 |
| Delivery window | 8 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Bamboo Viscose and locked shrinkage allowance before grading.
- Decoration was moved to Tie-Dye Wash after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 8,000 pieces delivered inside the 8-week window.
- Unit cost held within 1.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



