Case Study: Custom Multi Station Gym Fitness Set for a Marketing Agency in India
Multi Station Gym Fitness Set for a Marketing Agency in India
A Marketing Agency approached us with a multi station gym fitness set requirement for India. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Suppliers who disappear once the deposit is paid
- Unclear responsibility when a defect shows up after washing
- No reliable way to track a order once it enters production

What we specified
| Product | Multi Station Gym Fitness Set |
|---|---|
| Client type | A Marketing Agency |
| Market | India |
| Order volume | 8,000 pieces across 2 colourways |
| Base fabric | UPF 50+ Sun Fabric |
| Decoration | Quilting |
| Size range | XS-3XL |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around UPF 50+ Sun Fabric and locked shrinkage allowance before grading.
- Decoration was moved to Quilting after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 8,000 pieces delivered inside the 8-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the colour standard before grading. Once a shade moves, every downstream approval has to be redone and the calendar slips.

Planning something similar?
Book a 20-minute call with our merchandising team and get a written quotation within 48 hours.



