Case Study: Custom Off-The-Shoulder Dresses for a Manufacturing Plant in Saudi Arabia
Off-The-Shoulder Dresses for a Manufacturing Plant in Saudi Arabia
A Manufacturing Plant approached us with a off-the-shoulder dresses requirement for Saudi Arabia. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Unclear responsibility when a defect shows up after washing
- No reliable way to track a order once it enters production
- Minimum order quantities far above what a growing brand can absorb

What we specified
| Product | Off-The-Shoulder Dresses |
|---|---|
| Client type | A Manufacturing Plant |
| Market | Saudi Arabia |
| Order volume | 500 pieces across 2 colourways |
| Base fabric | Elastane Blend |
| Decoration | Yarn Dyeing |
| Size range | XS-3XL |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Elastane Blend and locked shrinkage allowance before grading.
- Decoration was moved to Yarn Dyeing after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 500 pieces delivered inside the 8-week window.
- Unit cost held within 2.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Fix the size ratio early. Changing the ratio after cutting starts is the single most expensive change a client can request.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



