Case Study: Custom Protective Clothing Factory Dress With Ppe for a University Athletic Department in Singapore
Protective Clothing Factory Dress With Ppe for a University Athletic Department in Singapore
A University Athletic Department approached us with a protective clothing factory dress with ppe requirement for Singapore. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Inconsistent sizing between production runs
- No reliable way to track a order once it enters production
- Suppliers who disappear once the deposit is paid

What we specified
| Product | Protective Clothing Factory Dress With Ppe |
|---|---|
| Client type | A University Athletic Department |
| Market | Singapore |
| Order volume | 3,000 pieces across 2 colourways |
| Base fabric | Velvet |
| Decoration | 3D Puff Embroidery |
| Size range | XS-3XL |
| Sampling rounds | 3 |
| Delivery window | 5 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Velvet and locked shrinkage allowance before grading.
- Decoration was moved to 3D Puff Embroidery after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 3,000 pieces delivered inside the 5-week window.
- Unit cost held within 1.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the colour standard before grading. Once a shade moves, every downstream approval has to be redone and the calendar slips.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



