Case Study: Custom Shorts Softball Wear for a Streetwear Collective in the Philippines
Shorts Softball Wear for a Streetwear Collective in the Philippines
A Streetwear Collective approached us with a shorts softball wear requirement for the Philippines. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Unclear responsibility when a defect shows up after washing
- Packaging that arrives crushed and unsellable
- Minimum order quantities far above what a growing brand can absorb

What we specified
| Product | Shorts Softball Wear |
|---|---|
| Client type | A Streetwear Collective |
| Market | the Philippines |
| Order volume | 3,000 pieces across 2 colourways |
| Base fabric | Oxford |
| Decoration | Bonding Construction |
| Size range | XS-3XL |
| Sampling rounds | 2 |
| Delivery window | 5 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Oxford and locked shrinkage allowance before grading.
- Decoration was moved to Bonding Construction after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 3,000 pieces delivered inside the 5-week window.
- Unit cost held within 4.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



