Case Study: Custom Silk Flower Brooches for a Construction Firm in Singapore
Silk Flower Brooches for a Construction Firm in Singapore
A Construction Firm approached us with a silk flower brooches requirement for Singapore. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Inconsistent sizing between production runs
- Packaging that arrives crushed and unsellable
- Color drift between lab dips and bulk fabric

What we specified
| Product | Silk Flower Brooches |
|---|---|
| Client type | A Construction Firm |
| Market | Singapore |
| Order volume | 8,000 pieces across 4 colourways |
| Base fabric | Viscose |
| Decoration | Tie-Dye Wash |
| Size range | S-4XL |
| Sampling rounds | 2 |
| Delivery window | 8 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Viscose and locked shrinkage allowance before grading.
- Decoration was moved to Tie-Dye Wash after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 8,000 pieces delivered inside the 8-week window.
- Unit cost held within 3.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the colour standard before grading. Once a shade moves, every downstream approval has to be redone and the calendar slips.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



