Case Study: Custom Green Down Jacket Women for an Airline Catering Team in South Korea
Green Down Jacket Women for an Airline Catering Team in South Korea
An Airline Catering Team approached us with a green down jacket women requirement for South Korea. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Unclear responsibility when a defect shows up after washing
- No reliable way to track a order once it enters production
- Packaging that arrives crushed and unsellable

What we specified
| Product | Green Down Jacket Women |
|---|---|
| Client type | An Airline Catering Team |
| Market | South Korea |
| Order volume | 500 pieces across 2 colourways |
| Base fabric | Anti-Static Fabric |
| Decoration | Snow Wash |
| Size range | Custom grading |
| Sampling rounds | 2 |
| Delivery window | 12 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Anti-Static Fabric and locked shrinkage allowance before grading.
- Decoration was moved to Snow Wash after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 500 pieces delivered inside the 12-week window.
- Unit cost held within 1.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.