Case Study: Custom Green Down Jacket Women for a Cycling Team in Kenya
Source:Green Down Jacket Women /
Time:2026-09-18
Green Down Jacket Women for a Cycling Team in Kenya
A Cycling Team approached us with a green down jacket women requirement for Kenya. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Inconsistent sizing between production runs
- Long lead times that miss the selling season
- Color drift between lab dips and bulk fabric

What we specified
| Product | Green Down Jacket Women |
|---|---|
| Client type | A Cycling Team |
| Market | Kenya |
| Order volume | 2,000 pieces across 4 colourways |
| Base fabric | Georgette |
| Decoration | Garment Dyeing |
| Size range | Custom grading |
| Sampling rounds | 3 |
| Delivery window | 6 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Georgette and locked shrinkage allowance before grading.
- Decoration was moved to Garment Dyeing after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 2,000 pieces delivered inside the 6-week window.
- Unit cost held within 2.0% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one process owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



