Case Study: Custom Pro Club Men Pullover Hoodie for a Military Supply Unit in Peru
Pro Club Men Pullover Hoodie for a Military Supply Unit in Peru
A Military Supply Unit approached us with a pro club men pullover hoodie requirement for Peru. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive shipping and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Suppliers who disappear once the deposit is paid
- Inconsistent sizing between production runs
- Packaging that arrives crushed and unsellable

What we specified
| Product | Pro Club Men Pullover Hoodie |
|---|---|
| Client type | A Military Supply Unit |
| Market | Peru |
| Order volume | 3,000 pieces across 6 colourways |
| Base fabric | Viscose |
| Decoration | Rhinestone Application |
| Size range | XS-3XL |
| Sampling rounds | 2 |
| Delivery window | 6 weeks from PO to ex-factory |
How it was resolved
- We rebuilt the tech pack around Viscose and locked shrinkage allowance before grading.
- Decoration was moved to Rhinestone Application after strike-off tests showed better wash durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and size ratio specification.

Result
- 3,000 pieces delivered inside the 6-week window.
- Unit cost held within 4.5% of the original quotation.
- Return rate linked to fit or workmanship stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample from the actual bulk fabric. Proto cloth behaves differently in cutting and washing.

Planning something similar?
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



