Bohemian Pro Club Men Pullover Hoodie in Ribbed Jersey with Mother-of-Pearl Buttons
Bohemian Pro Club Men Pullover Hoodie in Ribbed Jersey with Mother-of-Pearl Buttons
A Department Store Buyer approached us to develop a bohemian pro club men pullover hoodie around a single idea: mother-of-pearl buttons, executed in ribbed jersey. The capsule was destined for the United Kingdom and needed bohemian finishing that reads designer on the rail while staying repeatable in bulk. This case study records the brief, the specification and the delivery.
The challenge
- The previous factory could not hold consistency across sizes
- Fabric hand feel changed between production runs
- Unit costs were too high for a boutique price point

What we specified
| Product | Bohemian Pro Club Men Pullover Hoodie |
|---|---|
| Client type | A Department Store Buyer |
| Market | the United Kingdom |
| Order volume | 240 pieces across 3 colourways |
| Base material | Ribbed Jersey |
| Signature detail | Mother-of-Pearl Buttons |
| Size range | 0-14 |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | WRAP |
How it was built
- Reference garments and moodboards were translated into a measurement spec, not just photos.
- Ribbed Jersey was confirmed with lab dips and a hand-feel approval before grading.
- The pro club men pullover hoodie was prototyped on the fit model, then revised twice before pre-production.
- Mother-of-Pearl Buttons was applied in a controlled process to keep every piece consistent.
- Bulk ran with in-line inspection; a photo report was shared before shipment.

Result
- 240 pieces delivered inside the 8-week window.
- Unit cost held within 1.5% of the approved quotation.
- The a Department Store Buyer launched on schedule and reordered the same specification next season.
What we would repeat
Lock the colour standard before grading; every downstream approval depends on it.

Planning a similar capsule?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



