Contemporary Protective Clothing Factory Dress With Ppe in Mohair with Gathered Sleeves
Contemporary Protective Clothing Factory Dress With Ppe in Mohair with Gathered Sleeves
A Kidswear Subscription Box approached us to develop a contemporary protective clothing factory dress with ppe around a single idea: gathered sleeves, executed in mohair. The capsule was destined for Germany and needed contemporary finishing that reads designer on the rail while staying repeatable in bulk. This case study records the brief, the specification and the delivery.
The challenge
- The previous factory could not hold consistency across sizes
- Decoration durability failed after two washes
- Fabric hand feel changed between production runs

What we specified
| Product | Contemporary Protective Clothing Factory Dress With Ppe |
|---|---|
| Client type | A Kidswear Subscription Box |
| Market | Germany |
| Order volume | 120 pieces across 3 colourways |
| Base material | Mohair |
| Signature detail | Gathered Sleeves |
| Size range | 0-14 |
| Sampling rounds | 2 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | WRAP |
How it was built
- Reference garments and moodboards were translated into a measurement spec, not just photos.
- Mohair was confirmed with lab dips and a hand-feel approval before grading.
- The protective clothing factory dress with ppe was prototyped on the fit model, then revised twice before pre-production.
- Gathered Sleeves was applied in a controlled process to keep every piece consistent.
- Bulk ran with in-line inspection; a photo report was shared before shipment.

Result
- 120 pieces delivered inside the 6-week window.
- Unit cost held within 1.5% of the approved quotation.
- The a Kidswear Subscription Box launched on schedule and reordered the same specification next season.
What we would repeat
Lock the colour standard before grading; every downstream approval depends on it.

Planning a similar capsule?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



