Luxe White Long Sleeve Blouse With Collar in Washed Linen with Monogram Hardware
Luxe White Long Sleeve Blouse With Collar in Washed Linen with Monogram Hardware
A Trade Show Exhibitor approached us to develop a luxe white long sleeve blouse with collar around a single idea: monogram hardware, executed in washed linen. The capsule was destined for Norway and needed luxe finishing that reads designer on the rail while staying repeatable in bulk. This case study records the brief, the specification and the delivery.
The challenge
- Delivery missed the collection launch window
- Unit costs were too high for a boutique price point
- The previous factory could not hold consistency across sizes

What we specified
| Product | Luxe White Long Sleeve Blouse With Collar |
|---|---|
| Client type | A Trade Show Exhibitor |
| Market | Norway |
| Order volume | 240 pieces across 3 colourways |
| Base material | Washed Linen |
| Signature detail | Monogram Hardware |
| Size range | Custom grading |
| Sampling rounds | 3 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | OEKO-TEX Standard 100 |
How it was built
- Reference garments and moodboards were translated into a measurement spec, not just photos.
- Washed Linen was confirmed with lab dips and a hand-feel approval before grading.
- The white long sleeve blouse with collar was prototyped on the fit model, then revised twice before pre-production.
- Monogram Hardware was applied in a controlled process to keep every piece consistent.
- Bulk ran with in-line inspection; a photo report was shared before shipment.

Result
- 240 pieces delivered inside the 8-week window.
- Unit cost held within 1.5% of the approved quotation.
- The a Trade Show Exhibitor launched on schedule and reordered the same specification next season.
What we would repeat
Approve the hand feel on the actual bulk fabric — proto cloth always behaves differently.

Planning a similar capsule?
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



