Welcome to Apparel & Accessories official website!

Shirt Dress Customization Program for Warehousing and Logistics with Pleating

Source:Solution / Time:2026-10-01

Shirt Dress Customization Program for Warehousing and Logistics

This programme covers the full path from a shirt dress concept to repeatable bulk supply for warehousing and logistics. The build starts from everyday-casual references — shirt dress in french terry — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.

Most shirt dress buyers arrive with one of these problems: delivery missed the season drop, or delivery missed the season drop. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Shirt Dress for Warehousing and Logistics

Specification

ProductShirt Dress
Base fabricFrench Terry
DecorationPleating
Fabric weight240-280 gsm
Fit optionsRegular / Relaxed / Oversized
Colour options16 wash-stable shades
MOQ500 pieces per style per colour
Sampling12 working days, 4 days per revision
Bulk lead time30-50 days after approval
ComplianceISO 9001

What you can customise

  • Yarn Dyeing — quoted per position and per colour on French Terry.
  • Screen Printing — quoted per position and per colour on French Terry.
  • Puff Printing — quoted per position and per colour on French Terry.
  • Flocking — quoted per position and per colour on French Terry.
  • Smocking — quoted per position and per colour on French Terry.
  • Laser Cutting — quoted per position and per colour on French Terry.
  • Rhinestone Application — quoted per position and per colour on French Terry.

Shirt Dress Pleating detail

How we produce it

  1. Tech pack review, fabric confirmation and lab dip approval
  2. Pattern, grading and a French Terry-spec prototype
  3. Fit sample and wearer test, then pre-production sign-off
  4. Bulk cutting with pleating applied under controlled settings
  5. In-line inspection, final AQL 2.5 check and packing

Quality control

Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Shirt Dress reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.

FAQ

What is the minimum order quantity?

Standard programmes start at 500 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.

How is shipping handled?

We quote EXW, FOB, CIF and DDP. Consolidated sea freight is the default for bulk programmes, with air or express options when a launch date is at risk.

What file formats do you need for artwork?

Vector files (AI, EPS, PDF) give the best print and embroidery results. For raster artwork please supply at least 300 dpi at the final print size. We digitise embroidery files in-house and return a sew-out photo for approval.

How long does sampling take?

A first prototype is typically ready in 12 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 4 days each.

Start your shirt dress programme

Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top