Chino Pant Customization Program for Universities with Satin Printed Label
Chino Pant Customization Program for Universities
This programme covers the full path from a chino pant concept to repeatable bulk supply for universities. The build starts from everyday-casual references — chino pant in organic cotton — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most chino pant buyers arrive with one of these problems: the fit drifted between sizes, or delivery missed the season drop. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Chino Pant |
|---|---|
| Base fabric | Organic Cotton |
| Decoration | Satin Printed Label |
| Fabric weight | 160-180 gsm |
| Fit options | XS-3XL |
| Colour options | 16 wash-stable shades |
| MOQ | 300 pieces per style per colour |
| Sampling | 12 working days, 3 days per revision |
| Bulk lead time | 30-60 days after approval |
| Compliance | ISO 9001 |
What you can customise
- Enzyme Wash — quoted per position and per colour on Organic Cotton.
- Garment Dyeing — quoted per position and per colour on Organic Cotton.
- Padding and Wadding — quoted per position and per colour on Organic Cotton.
- Beading and Embroidery — quoted per position and per colour on Organic Cotton.
- Heat Transfer Printing — quoted per position and per colour on Organic Cotton.
- Custom Zip Puller — quoted per position and per colour on Organic Cotton.
- Tonal Embroidery — quoted per position and per colour on Organic Cotton.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Organic Cotton-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with satin printed label applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Chino Pant reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
How long does sampling take?
A first prototype is typically ready in 12 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.
What is the minimum order quantity?
Standard programmes start at 300 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.
Can you match a specific colour?
Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.
Do you provide compliance documents?
We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for ISO 9001, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.
Start your chino pant programme
Send us your tech pack or even a rough sketch — we will come back with fabric options, a costed sample plan and a realistic production calendar.



