Welcome to Apparel & Accessories official website!

Drawstring Short Customization Program for Wholesale and Distribution with Shirring

Source:Solution / Time:2026-10-01

Drawstring Short Customization Program for Wholesale and Distribution

This programme covers the full path from a drawstring short concept to repeatable bulk supply for wholesale and distribution. The build starts from everyday-casual references — drawstring short in corduroy — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.

Most drawstring short buyers arrive with one of these problems: colour faded after a few washes, or colour faded after a few washes. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Drawstring Short for Wholesale and Distribution

Specification

ProductDrawstring Short
Base fabricCorduroy
DecorationShirring
Fabric weight160-180 gsm
Fit optionsXS-3XL
Colour options6 wash-stable shades
MOQ200 pieces per style per colour
Sampling12 working days, 3 days per revision
Bulk lead time25-50 days after approval
ComplianceGOTS

What you can customise

  • Bonding Construction — quoted per position and per colour on Corduroy.
  • Yarn Dyeing — quoted per position and per colour on Corduroy.
  • Placement Printing — quoted per position and per colour on Corduroy.
  • Tie-Dye Wash — quoted per position and per colour on Corduroy.
  • Heat Transfer Printing — quoted per position and per colour on Corduroy.
  • Shirring — quoted per position and per colour on Corduroy.
  • Contrast Stitching — quoted per position and per colour on Corduroy.

Drawstring Short Shirring detail

How we produce it

  1. Tech pack review, fabric confirmation and lab dip approval
  2. Pattern, grading and a Corduroy-spec prototype
  3. Fit sample and wearer test, then pre-production sign-off
  4. Bulk cutting with shirring applied under controlled settings
  5. In-line inspection, final AQL 2.5 check and packing

Quality control

Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Drawstring Short reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.

FAQ

Do you provide compliance documents?

We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for GOTS, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.

How long does sampling take?

A first prototype is typically ready in 12 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.

What file formats do you need for artwork?

Vector files (AI, EPS, PDF) give the best print and embroidery results. For raster artwork please supply at least 300 dpi at the final print size. We digitise embroidery files in-house and return a sew-out photo for approval.

Can you match a specific colour?

Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.

Start your drawstring short programme

Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top