Longline Tee Customization Program for Warehousing and Logistics with Woven Label
Longline Tee Customization Program for Warehousing and Logistics
This programme covers the full path from a longline tee concept to repeatable bulk supply for warehousing and logistics. The build starts from everyday-casual references — longline tee in ribbed cotton — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.
Most longline tee buyers arrive with one of these problems: wholesale costs squeezed the retail margin, or the fit drifted between sizes. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Specification
| Product | Longline Tee |
|---|---|
| Base fabric | Ribbed Cotton |
| Decoration | Woven Label |
| Fabric weight | 200-220 gsm |
| Fit options | XS-3XL |
| Colour options | 6 wash-stable shades |
| MOQ | 800 pieces per style per colour |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | WRAP |
What you can customise
- Piping and Binding — quoted per position and per colour on Ribbed Cotton.
- Beading and Embroidery — quoted per position and per colour on Ribbed Cotton.
- Glow-in-the-Dark Printing — quoted per position and per colour on Ribbed Cotton.
- Flat Embroidery — quoted per position and per colour on Ribbed Cotton.
- Shirring — quoted per position and per colour on Ribbed Cotton.
- Placement Printing — quoted per position and per colour on Ribbed Cotton.
- Garment Dyeing — quoted per position and per colour on Ribbed Cotton.

How we produce it
- Tech pack review, fabric confirmation and lab dip approval
- Pattern, grading and a Ribbed Cotton-spec prototype
- Fit sample and wearer test, then pre-production sign-off
- Bulk cutting with woven label applied under controlled settings
- In-line inspection, final AQL 2.5 check and packing
Quality control
Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Longline Tee reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.
FAQ
How long does sampling take?
A first prototype is typically ready in 10 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 3 days each.
What is the minimum order quantity?
Standard programmes start at 800 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.
What file formats do you need for artwork?
Vector files (AI, EPS, PDF) give the best print and embroidery results. For raster artwork please supply at least 300 dpi at the final print size. We digitise embroidery files in-house and return a sew-out photo for approval.
Do you provide compliance documents?
We can arrange OEKO-TEX, GOTS, BSCI, WRAP and ISO documentation as well as third-party testing reports for WRAP, and we support REACH, CPSIA and Prop 65 declarations for the relevant markets.
Start your longline tee programme
Share a reference photo or a sample garment and we will reverse-engineer the specification for your own label.



