Welcome to Apparel & Accessories official website!

Chino Pant Customization Program for Airlines and Cruise Lines with Foil Printing

Source:Solution / Time:2026-10-01

Chino Pant Customization Program for Airlines and Cruise Lines

This programme covers the full path from a chino pant concept to repeatable bulk supply for airlines and cruise lines. The build starts from everyday-casual references — chino pant in cotton jersey — then locks fabric weight, wash behaviour and fit tolerance so every reorder matches the approved sample.

Most chino pant buyers arrive with one of these problems: the previous supplier could not hold consistency on reorders, or the fit drifted between sizes. The fix is a written spec before bulk: shrinkage allowance, stitch density, colour tolerance and a golden sample kept at the factory.

Chino Pant for Airlines and Cruise Lines

Specification

ProductChino Pant
Base fabricCotton Jersey
DecorationFoil Printing
Fabric weight240-280 gsm
Fit optionsXS-3XL
Colour options6 wash-stable shades
MOQ500 pieces per style per colour
Sampling7 working days, 4 days per revision
Bulk lead time20-50 days after approval
ComplianceGOTS

What you can customise

  • Satin Printed Label — quoted per position and per colour on Cotton Jersey.
  • Reflective Printing — quoted per position and per colour on Cotton Jersey.
  • Distressed Finish — quoted per position and per colour on Cotton Jersey.
  • Custom Zip Puller — quoted per position and per colour on Cotton Jersey.
  • Enzyme Wash — quoted per position and per colour on Cotton Jersey.
  • Snow Wash — quoted per position and per colour on Cotton Jersey.
  • DTF Film Printing — quoted per position and per colour on Cotton Jersey.

Chino Pant Foil Printing detail

How we produce it

  1. Tech pack review, fabric confirmation and lab dip approval
  2. Pattern, grading and a Cotton Jersey-spec prototype
  3. Fit sample and wearer test, then pre-production sign-off
  4. Bulk cutting with foil printing applied under controlled settings
  5. In-line inspection, final AQL 2.5 check and packing

Quality control

Every bulk lot is compared against the approved sample for shade, hand feel, measurements and wash behaviour. Chino Pant reorders stay comparable over time because the spec, the lab dip and the golden sample are all on file.

FAQ

How long does sampling take?

A first prototype is typically ready in 7 working days after the tech pack is confirmed, including fabric sourcing if the base cloth is not in our stock library. Revisions add about 4 days each.

What is the minimum order quantity?

Standard programmes start at 500 pieces per style and colour. We can split sizes across a size set, and for first orders we often accept a mixed-colour run to help you test the market.

Can you match a specific colour?

Yes. Send us a Pantone TCX reference or a physical swatch. We return lab dips for approval and hold bulk shade within the agreed tolerance band before cutting.

How is shipping handled?

We quote EXW, FOB, CIF and DDP. Consolidated sea freight is the default for bulk programmes, with air or express options when a launch date is at risk.

Start your chino pant programme

Tell us the quantity, target price and delivery window, and we will build a customisation programme around those three numbers.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top